View photos from the electric cooperative response to Hurricane Isaias, which made landfall Oct. 9 on Florida’s Gulf Coast as a Category 2 storm. (See related story.)
Photo Gallery: The Co-op Response to Hurricane Isaias
1 of 25
2 of 25
3 of 25
4 of 25
5 of 25
6 of 25
7 of 25
8 of 25
9 of 25
10 of 25
11 of 25
12 of 25
13 of 25
14 of 25
15 of 25
16 of 25
17 of 25
18 of 25
19 of 25
20 of 25
21 of 25
22 of 25
23 of 25
24 of 25
25 of 25
Escambia River Electric Cooperative crews wrap up another day of power restoration on Oct. 12. (Photo Courtesy: Escambia River Electric Cooperative)
CHELCO crews work to wrap up power restoration efforts after Hurricane Isaias wreaked havoc on their system. (Photo Courtesy: CHELCO)
Escambia River Electric Cooperative crews have been dealing with extensive damage in their Florida service territory after Hurricane Isaias. Around 95% of the co-op’s system was out in the immediate aftermath of the storm. (Photo Courtesy: Escambia River Electric Cooperative)
Talquin Electric Cooperative material clerks continue their support efforts with West Florida Electric Cooperative on Oct. 13. (Photo Courtesy: Talquin Electric Cooperative)
DeFuniak Springs, Florida-based CHELCO faced the single largest number of outages in the wake of Hurricane Isaias. "This is easily the largest storm response in CHELCO’s history," the co-op said Oct. 10 on Facebook. (Photo Courtesy: CHELCO)
Crews from Sumterville, Florida-based SECO Energy headed to the Florida Panhandle to assist CHELCO with power restoration after Hurricane Isaias. (Photo Courtesy: SECO Energy)
Crews from Sumterville, Florida-based SECO Energy headed to the Florida Panhandle to assist CHELCO with power restoration after Hurricane Isaias. (Photo Courtesy: SECO Energy)
In Mississippi, a Singing River Electric Cooperative member service representative listens to outage messages and returns calls during the storm response for Hurricane Isaias. (Photo Courtesy: Singing River Electric Cooperative)
In Mississippi, a Singing River Electric Cooperative member service representative listens to outage messages and returns calls during the storm response for Hurricane Isaias. (Photo Courtesy: Singing River Electric Cooperative)
In Mississippi, Singing River Electric Cooperative crews quickly dealt with a downed tree that caused an outage on Highway 26. (Photo Courtesy: Singing River Electric Cooperative)
In Georgia, Snapping Shoals EMC crews were out before daylight Oct. 10 to restore outages to more than 4,000 members. (Photo Courtesy: Snapping Shoals EMC)
In Georgia, Sawnee EMC crews faced downed trees and equipment after Hurricane Isaias passed through the area on Oct. 10. (Photo Courtesy: Sawnee EMC)
In Alabama, Crews work to restore power in Baldwin EMC's service territory on Oct. 10. (Photo Courtesy: Baldwin EMC)
Crews from Dade City, Florida-based Withlacoochee River Electric Cooperative have been assisting CHELCO with restoration efforts. (Photo Courtesy: Withlacoochee River Electric Cooperative)
Crews from DEMCO in Louisiana headed to Escambia River Electric Cooperative in Florida to assist with restoration efforts. (Photo Courtesy: DEMCO)
In Alabama, Wiregrass Electric Cooperative’s Energy Control Center has been hard at work after Hurricane Isaias. (Photo Courtesy: Wiregrass Electric Cooperative)
South Alabama Electric Cooperative crews work to restore damage from Hurricane Isaias on Oct. 11. (Photo Courtesy: South Alabama Electric Cooperative)
Baldwin EMC crews work alongside mutual aid crews in the wake of Hurricane Isaias. (Photo Courtesy: Baldwin EMC)
Withlacoochee River Electric Cooperative crews have been assisting CHELCO in repairing damage from Hurricane Isaias. (Photo Courtesy: Withlacoochee River Electric Cooperative)
On the morning of Oct. 12, CHELCO was working to restore power to 20,000 members. (Photo Courtesy: CHELCO)
Crews prepare for another day of hard work restoring power in CHELCO's service territory on Oct. 12. (Photo Courtesy: CHELCO)
Crews prepare for another day of hard work restoring power in CHELCO's service territory on Oct. 12. (Photo Courtesy: CHELCO)
South Alabama Electric Cooperative crews work to restore power in the aftermath of Hurricane Isaias on Oct. 11. (Photo Courtesy: South Alabama Electric Cooperative)
Wiregrass Electric Cooperative crews work to restore power on Oct. 12 after Hurricane Isaias left the majority of their system without power. (Photo Courtesy: Wiregrass Electric Cooperative)
Wake Electric crews joined Wiregrass Electric Cooperative to help restore power on Oct. 12. (Photo Courtesy: Wiregrass Electric Cooperative)
PublishedOctober 11, 2026